The last day of our Thanksgiving/Birthday blowout we discovered a huge sewer backup that flooded the new house from both sides of the first floor. It. was. disgusting. It started a huge ordeal of emergency clean-up crews, mold-testing and Standard Pacific's head of warranty dept overseeing everthing. It was a big, messy deal. They had to rip out all the carpet, tile, and some of the wood, baseboards, doors, moldings. They cleaned and then tested the house 3 times before it got a green light from the mold guy for the rebuild. Fortunately for us, they let us re-do the master bath at the same time. It was the only ugly part of the house when we bought it. Apparently every dark cloud has a silver lining.
Monday, November 29, 2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment